• 当前位置:
  • 首页
  • >
  • PDF资料
  • >
  • 61001M PDF文件及第2页内容在线浏览

61001M

61001M首页预览图
型号: 61001M
PDF文件:
  • 61001M PDF文件
  • 61001M PDF在线浏览
功能描述: E-SPARK CONVERSION
PDF文件大小: 85.18 Kbytes
PDF页数: 共4页
制造商: MALLORY[Mallory performance club]
制造商LOGO: MALLORY[Mallory performance club] LOGO
制造商网址: http://mallory-ignition.com/
捡单宝61001M
PDF页面索引
120%
Step 9
Install the grommet in the hole in the distributor hosing where the primar y
point wire had previously fed through. Slide the three wires from the
module, through the grommet, to outside the distributor housing.
Step 10
(See Figure 2)
Put the three wires from the module in the female connector: green wire in
hole #1; brown wire in hole #2; red wire in hole #3. Plug the distributor wire
harness into the female connector. See Figure 2.
Step 11
Install the two–piece shutter underneath the rotor drive plate and install two
8-32 bolts. The hex heads of the 8-32 bolts fits into the matching holes on
the underside of the shutter wheel. Install the rotor on the rotor drive and
install two 8-32 hex nuts. See Figure 1.
NOTE: Some distributors use a rotor made from a flexible plastic. File
or cut the rotor locator (on the bottom of the rotor) so that it measures
1/8" in length. Install rotor and shutter as described in Step 11.
Step 12
Install the distributor with the rotor and vacuum chamber pointing in the
direction as noted in Step 5. The rotor must be pointing (approxima tely) at
the mark on the distributor housing from Step 2.
NOTE: The distributor must be fully seated into the engine. It may be
necessary to turn the oil pump drive, or turn the engine crankshaft
two full turns until the timing mark lines up (again) with the TDC mark
on the timing tab, to allow the distributor to seat fully.
Step 13
Turn the distributor housing until the nearest slot on the shutter wheel is
approximately in the center of the optics of the module. This will generally
give timing close enough for starting purposes. The rotor must be pointing
(approximately) at the mark on the distributor housing from Step 2. Put the
distributor hold down clamp in place and tighten slightly, leaving it loose
enough to turn the distributor.
Step 14
Install the distributor cap.
WIRING PROCEDURE
(See Figures 3, 4 and 5)
Step 1
Make sure that your vehicle is equipped with an ignition ballast resistor (or
loom resistance wire) in the wire between the ignition switch and the coil
(+) terminal. If you find your vehicle is not equipped with an ignition ballast
resistor, install a Mallor y Ignition Ballast Resistor Part No. 700 in series in
the wire from the ignition switch. For optimum performance in systems
without a HyFire or similar ignition control, use one of Mallory's 3 specially
matched coils which eliminates the need for a ballast resistor or a
resistance wire. These coils are: 29219- Chrome Canister Coil, 30450
PROMASTER e Coil and 29450 PROMASTER Classic Coil.
Step 2
There are three wires coming from the distributor wire harness:
RED WIRE: Connect to the coil (+) terminal.
GREEN WIRE: Connect to the coil (–) terminal.
BROWN WIRE: Connect to engine block ground.
Clean away any grease, oil and paint from the mounting surface before the
connection is made.
NOTE: If a HYFIRE
®
Electronic Ignition Control or any other aftermarket
ignition control is being used, connect the distributor wire harness
according to the instructions supplied with the ignition control.
DISTRIBUTOR TUNE–UP PARTS PART NO.
DISTRIBUTOR CAP 202
ROTOR 303
SHUTTER WHEEL (TWO PIECE) 338
E-Spark™ MODULE 6100M
DISTRIBUTOR WIRE HARNESS 29349
STARTING THE ENGINE
CAUTION: Be sure all tools, wires and miscellaneous objects are clear
of moving engine parts and extreme heat before starting the engine.
Recheck all wires and connections to make sure they are correct. Check
and clean, or replace spark plugs. If replacing spark plugs, use types
recommended by the engine manufacturer.
Step 1
Connect a timing light. F ind the area with the best view of the timing marks.
Step 2
Start engine. If it fails to start, rotate the distributor in small increments
clockwise or counterc lockwise until engine starts. Do not exceed more than
ten degrees of distributor housing rotation in either direction.
Step 3
Set timing as recommended by engine manufacturer, then tighten distribu-
tor hold down clamp. Make sure timing is still correct. If timing has moved,
repeat this procedure.
Step 4
Re-connect the vacuum hose between the vacuum chamber and
the carburetor.
FIGURE 1
E-SPARK
MODULE
www.mrgasket.com MALLORY IGNITION2
购买、咨询产品请填写询价信息:(3分钟左右您将得到回复)
询价型号*数量*批号封装品牌其它要求
删除
删除
删除
删除
删除
增加行数
  •  公司名:
  • *联系人:
  • *邮箱:
  • *电话:
  •  QQ:
  •  微信:

  • 关注官方微信

  • 联系我们
  • 电话:13714778017
  • 周一至周六:9:00-:18:00
  • 在线客服:

天天IC网由深圳市四方好讯科技有限公司独家运营

天天IC网 ( www.ttic.cc ) 版权所有©2014-2023 粤ICP备15059004号

因腾讯功能限制,可能无法唤起QQ临时会话,(点此复制QQ,添加好友),建议您使用TT在线询价。

继续唤起QQ 打开TT询价